PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation in front of the Court Building (South Side) (800x600).jpg Installing the underground Tele-Data piping at Rahway Ave. Facing South side of the Court Building (800x600).jpg Installing the underground Tele-Data piping at Rahway Ave. in front of the New Court Building (800x600).jpg Compacting along column line 1 from B-D Facing South (800x600).jpg Excavation at Rahway Ave. View from the 3rd Floor (800x600).jpg Installed electrical conduit at the Sprinklers Room (152A) Facing South (800x600).jpg Installing bearing plate boxes at Stair -2 (4th Floor) Facing South (800x600).jpg Lifted the slip forms to the 4th Floor at Elev. 1,2,3 Facing East (800x600).jpg
Previous pageNext page Excavation at Rahway Ave. View from the 3rd Floor (800x600)
Excavation at Rahway Ave. View from the 3rd Floor (800x600)